Village: Mandrup
Taluka: Solapur
State: Maharashtra
Country: India
Latitude: 17.499
Longitude: 75.783
Solar Park Capacity(MW): 50
Installed Capacity(MW): 37.5
Total Area: Approx 200 acres
Total no of investors: 29
Minimum Project Capacity (MW): 0.60 MW
Maximum Project Capacity (MW): 6.65 MW
PV Module Technology: Poly Crystalline Silicon, Thin Film
PV System Mounting Structure Type: Fixed, Seasonal, Single Axis Tracker
Power Evacuation:33 kV double circuit Panther line, connected to 132/33 kV Mandrup Substation
Estimated Life of Project: 25